How to Hire a Roofer in Edmonton (and Spot the Ones to Avoid)
The Alberta-specific checks that separate a real roofing company from a season-long operation, what belongs in a proper quote, and the red flags worth walking away from.
Royal Roofing Edmonton
Edmonton roofing & exteriors since 2011
Hiring a roofer is an unusual purchase. It is one of the largest single expenses a house incurs, the work is buried under the finished surface within hours, and most homeowners will do it twice in a lifetime, which is not enough repetition to get good at it.
The result is that people compare the one number they understand, which is the price, and hope the rest sorts itself out. Here is a better way to do it, with the checks that are specific to Alberta.
Start with the Alberta-specific checks
These three take about fifteen minutes and eliminate most of the risk.
1. The prepaid contracting business licence
This is the one almost nobody knows about, and it is the most useful filter available.
Under Alberta’s Consumer Protection Act, any contractor who takes payment from a consumer before the work is completely finished must hold a prepaid contracting business licence issued by Service Alberta. That covers essentially every roofing company, because essentially every roofing company takes a deposit or a progress draw.
Ask for the licence number. A legitimate established company will give it to you without hesitation. An operation that has been in Alberta for six weeks generally cannot. Alberta also requires that for a contract signed at your home, you must have expressly invited the contractor to attend before they showed up. A crew that knocked on your door uninvited after a hailstorm is already operating outside those rules.
2. WCB coverage, verified
Ask for a current WCB Alberta clearance letter. Not a verbal assurance, the actual document.
This is not paperwork for its own sake. If an uninsured worker falls off your roof, you can find yourself exposed. A clearance letter takes the contractor thirty seconds to produce and takes that risk off your property.
3. Liability insurance, with a certificate
Two million dollars of commercial general liability is the normal figure in this market. Ask for the certificate showing the coverage and the expiry date. A company that hesitates on this question is telling you something important.
What a real quote actually contains
The gap between a good roofing quote and a bad one is not the price. It is the specificity. A quote with one line and one number cannot be compared against anything, which is frequently the point.
A proper Edmonton roofing quote spells out:
- The shingle by name and line. “IKO Nordic” or “BP Vangard 42 IR”, not “architectural shingles”. This matters more than it sounds: IKO Dynasty and IKO Nordic look similar on a quote and only one of them is Class 4 impact rated, which is the difference between qualifying for an insurance discount and not.
- Where the ice and water shield goes. At every eave, in every valley, around every penetration, and how far up from the eave. In this climate, a quote that does not mention membrane placement is not a complete quote.
- The underlayment. Synthetic across the whole deck, named.
- Which flashings are being replaced versus reused. Reused flashing is the most common source of a leak on an otherwise good new roof.
- A per-sheet price for deck repairs, stated before tear-off. Typically $75 to $150 per sheet installed in Edmonton. Getting this number in writing in advance is how you avoid negotiating on your driveway with the roof already open.
- The ventilation plan. What intake and exhaust exists, what is being added or corrected, and whether the soffit intake is actually clear.
- Tear-off, disposal, and cleanup, including whether a magnetic nail sweep is included.
- The workmanship warranty, in years, in writing, distinct from the manufacturer’s product warranty.
- Payment schedule and total including GST.
If two quotes are $3,000 apart, this list is almost always where the $3,000 went.
Red flags
Pressure to sign today. Any discount that expires at the end of the visit is a sales technique, not a discount. A real roof will still need replacing next week.
A price given without anyone getting on the roof. Satellite measurements are a useful estimating tool and they are not an inspection. Nobody can tell you the condition of your flashings, your deck or your ventilation from a photograph.
Large cash deposits before materials arrive. A modest deposit is normal. Half the job in cash up front is not.
“We’ll cover your deductible.” In Alberta this is insurance fraud, it puts your claim at risk, and a company willing to do it on your behalf is telling you exactly how they operate.
Out-of-province plates after a storm. Some travelling crews are competent. The problem is the warranty: a ten-year workmanship warranty is worth nothing from a company that will not be in Alberta in eighteen months.
No physical local address. Not a PO box, not a phone number. A place you could drive to.
Vague answers about who is actually doing the work. Many companies sell the job and subcontract the labour to whoever is available that week. That is where consistency goes. Ask directly: is the crew on my roof your employees?
Reluctance to name the shingle. Covered above, and worth repeating.
The deposit question
Reasonable practice in Edmonton looks roughly like this: a modest deposit to hold the date and order materials, a progress payment when materials are delivered or the tear-off is complete, and the balance on completion after you have walked the job.
What is not reasonable is a large payment before anything has happened, and particularly a large payment in cash. Pay by cheque or e-transfer so there is a record, and get a receipt that references the written quote.
Remember the licence point above: a contractor taking any money before the work is finished should hold a prepaid contracting licence.
Understanding the two warranties
Homeowners routinely conflate these, and salespeople occasionally encourage it.
The manufacturer’s product warranty covers defects in the shingle itself. It is typically 25 to 50 years or “lifetime limited”, it is almost always prorated after an initial non-prorated period, and it excludes anything caused by improper installation or inadequate ventilation. A shingle failing because of a manufacturing defect is rare.
The workmanship warranty comes from the contractor and covers the installation. This is the one that matters, because installation is what actually fails. Ours is ten years, in writing, and if a roof we installed leaks because of how we installed it, we come back.
Two questions worth asking about any workmanship warranty: how long, and how long has the company existed? A twenty-five-year warranty from a three-year-old company is an aspiration.
Questions worth asking on the estimate visit
- How long have you been operating in the Edmonton area, under this business name?
- Are the crew your employees or subcontractors?
- What is your prepaid contracting licence number?
- Can I see your WCB clearance letter and liability certificate?
- Which shingle, specifically, and is it Class 3 or Class 4?
- Where exactly does the ice and water shield go?
- Did you look in the attic? What is the ventilation doing?
- What is your per-sheet price for deck repairs?
- What does your workmanship warranty cover, and for how long?
- Can I see two or three roofs you did in this area more than five years ago?
That last one is the best question on the list. Anyone can show you a roof they finished last week.
Why the cheapest quote is usually the most expensive
Roofing is not a commodity, and the price differences between quotes almost always trace to real scope differences.
A $2,500 gap on an Edmonton re-roof typically represents some combination of: felt instead of synthetic underlayment, membrane only in the valleys instead of at every eave, reused flashings, no ventilation correction, three nails per shingle instead of the specified four to six, and no deck inspection worth the name.
None of that is visible on the day the job is finished. All of it is visible in year eight, when the roof you paid less for needs replacing five years before it should have, and you pay for a second roof inside twenty years.
The right way to use a low quote is as a question: what is in the other quote that is not in this one? If the low bidder can answer that convincingly, they may genuinely be better value. If they cannot, you now know why they are cheaper.
What we would do in your position
Get three quotes. Insist that all three include the items in the list above so you are comparing like with like. Verify licence, WCB and insurance on all three. Ask each one what they found in your attic, because the one who actually looked will have an answer.
Then pick the company you believe will still be answering the phone in ten years, not the cheapest number on the page.
We have been on Edmonton roofs since 2011, we run our own crews rather than subcontracting, and every install carries a ten-year written workmanship warranty. If you want an estimate that includes all of the above in writing, get in touch and we will come and look at the roof properly. And if you would rather understand the pricing first, our Edmonton roof replacement cost guide lays out real numbers before anyone knocks on your door.
Free On-Site Estimate
Want a straight answer on your own roof?
We come out, get on the roof, check the attic and the eaves, and send you a written quote. No pressure, no scare tactics, and we will tell you when a repair is all you need.
Keep reading
All articles
Attic Rain in Edmonton: Why Your Ceiling Drips in February
Water staining your ceiling after a cold snap breaks is almost never a roof leak. Here is what attic rain is, why Edmonton homes get it, and how to actually fix it.
Read the guide
The Best Shingles for Edmonton Weather: IKO, BP, Malarkey and GAF Compared
Wind ratings, impact class and real Edmonton performance for the four shingle brands we install most, plus the parts of the system that matter more than the brand.
Read the guide
The Best Time of Year to Replace a Roof in Edmonton
Season by season, what actually changes for an Edmonton re-roof: pricing, scheduling, shingle sealing temperatures, and whether winter roofing is a real option.
Read the guide